Contruction 2 Resource Notes


Section 1: 
Section 2
Section 3:
Section 4
Section 5
Section 6:

Terminology
Construction details
Consultants and Authorities
Footing construction report 
Site establishment 
Building Elements 

9
11
13
25
35












Section 7:
Section 8:
Section 9:
Section 10: 
Section 11:
1. Footing systems
2. Suspended floor systems
3. Waterproofing of wet areas
4. Masonry wall
5. Steel framing
6. Timber roof trusses
7. Cathedral roof system
8. Installation of claddings and linings
9. Metal sheet roofing
10. Roof flashing and capping
 
Joinery and fitments
Stairs  
 Site works
Services
Energy efficient housing
Suggested responses

37
43
57
65
77
83
89
93
99
109

115
125
133
143
157
171

Building Construction Notes

Building Construction Notes are a special Learning Resource specifically designed and written for this Construction Module. You will notice that the numbers on these notes follow on from the notes you received with Construction 1.

Section 3 : Consultants and Authorities
            No.56. Building Regulations
Section 6 : Building Elements
Part one: Footing Systems
            No.57. Stiffened Raft System
            No.58. Pier and Beam Footings
Part two : Suspended Floor Systems
            No.59. Insltu Concrete Floors
            No.60. Composite Floor System
            No.61. Principles of Good Formwork
            No.62. Formwork for Concrete
            No.63. Formwork for Stairs
            No.64. Timber Floor Systems
Part three: Waterproofing of Wet Areas
            No.65. Waterproofing of Wet Areas
Part four: Masonry Walls
            No.66. Terminology
            No.67. Structural Stability
            No.68. Dimensional Stability
            No.69. Mortar and Stains
            No.70. Design of Cavity Walls
            No.71. Moisture Penetration
Part 1 - Damp-proof Courses
            No.72. Moisture Penetration
Part 2 - Cavity Flashing
            No.73. Lintels in Masonry Wall

Part five : Steel Framing
            No.74. The Quality Alternative
            No.75. Acceptable Construction
            No.76. Installation of Services
Part six : Timber Roof Trusses
            No. 77. Design Considerations
            No.78. Site Considerations
Part seven: Cathedral Roof System
            No.79. Cathedral Roof System
Part nine: Metal Sheet Roofing
            No.80. Roof Coverings
                          Metal Sheet Roofing
Part ten: Roof Flashing and Capping
            No.81. Construction Sheet Roofing
Section 7 Joinery and Fltrnents
                      Door Hardware
            No.82. Locking Systems
            No.83. Keyed Systems
Section 8 : Stairs
            No.84. Terminology
            No.85. Construction Details
Section 10 : Services
            No.86. Heating and Cooling


     Click here for Notes Construction 1