Example Student Assignment Submission

Task:
Prepare a written chronological report on the construction of a two (multi level) residential construction covering all areas listed in Assignment requirements.

This is a guide to find out about what needs to be covered.

This is a Student Submission of a Construction 2 Assignment

Site Works Slab on Ground Brick Work Roof Framing Stick Roof Elevations Suspended Concrete Slab Ceiling Fixer / Internal Plaster

Please note that this an extract and only some pages are shown in this example



     
Quit a few students had difficulies to find an appropiate building sites.

This student did a relative good job and covered all Assigments topis.

This is a vergin building site Lot 112 Lomandra Drive, Canning Vale


Site Works


Go to top

Slab on Ground





Go to top


Brick Work






Go to top


Roof Framing


Go to top

Stick Roof Elevations


Go to top







An other Building needed to be investigated because it was not possible for students
to cover all matter of the Assignment in time.

Go to top

Suspended Concrete Slab








Go to top


Ceiling Fixer / Internal Plaster

  





Go to top